- Date connected
- 8 Mar 2018
- Status
- Connected
- Planning consent
- Granted on appeal 6 Mar 2017
West Lothian, reference LIVE/0502/FUL/16 · Source: REPD - Customer
- Res Ltd
- Site name
- Broxburn Energy Storage
- Address
- 2 Illieston Castle Steading, Broxburn, West Lothian, EH52 5PD
- Grid reference
- Easting 309138, northing 670510
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Broxburn
- Bulk supply point
- Not stated
- Primary substation
- Broxburn
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy, Storage - Electrochemical (Batteries): 27.5 MW registered
- Registered capacity
- 27.5 MW
- Maximum export capacity
- 20 MW
- Maximum import capacity
- 20 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800000000064
- Import MPAN
- Not stated
- Last updated
- 14 Sep 2020
- Tracked since
- March 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Broxburn
GSP view4 other sites at this grid supply point in the September 2026 edition, 2 of them at Broxburn, the same primary substation. In all, the sites here total 196 MW: 99 MW connected, 97 MW accepted to connect.
- East Mains Generating PlantGrid Connection Consulting, Gas and other fossil, EAST MAINS (11KV) primaryConnected10 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.