Dalmarnock Road BESS (Former Sanmex Site)

At Dalmarnock

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
11 Sep 2026
Status
Accepted to connect
Planning consent
Granted 16 Feb 2022
South Lanarkshire, reference P/21/1525 · Source: REPD
Customer
Not stated
Site name
Dalmarnock Road BESS (Former Sanmex Site)
Address
Downiebrae Road, Rutherglen, Glasgow, Glasgow City, G73 1NY
Grid reference
Easting 261853, northing 662585
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Dalmarnock
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 50.4 MW registered
Registered capacity
50.4 MW
Change to maximum export capacity
40 MW
Change to maximum import capacity
40 MW
Flexible connection
No
In a connection queue
No
Date accepted
4 Nov 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
29 Nov 2024
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Target energisation date moved from 1 Sep 2026 to 11 Sep 2026 (10 days later)
  • June 2026 edition
    Target energisation date moved from 11 Aug 2026 to 1 Sep 2026 (1 month later)
  • May 2026 edition
    Target energisation date moved from 11 May 2026 to 11 Aug 2026 (3 months later)

Also at Dalmarnock

GSP view

4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 98.2 MW: 18.6 MW connected, 79.6 MW accepted to connect.

  • Rutherglen ParkRubicon Land Ltd, Storage, Dalmarnock GSP primaryAccepted29.208 MW
  • Polmadie Resource Recovery FacilityViridor, Bioenergy and wasteConnected16 MW
  • SMGFullarton Drive Cambuslang Herald & Times Group, Gas and other fossil, CAMBUSLANG (11kV) primaryConnected1.6 MW
  • Dalmarnock WWTWScottish Water Horizons Limited, Gas and other fossil, ASHGROVE STREET (11kV) primaryConnected1 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.