Calachem (Earls Gate Power Systems)
Calachem Ltd at Grangemouth
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 19 Oct 2023
- Status
- Connected
- Customer
- Calachem Ltd
- Site name
- Calachem (Earls Gate Power Systems)
- Address
- Calachem Fine Chemicals, Earls Road, Grangemouth, Stirlingshire, FK3 8XG
- Grid reference
- Easting 291914, northing 681479
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Grangemouth
- Bulk supply point
- Not stated
- Primary substation
- AVECIA (Customer substation)
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- CHP, Steam-gas turbine (CCGT): 28 MW registered
- Registered capacity
- 28 MW
- Maximum export capacity
- 28 MW
- Maximum import capacity
- 16.5 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 3 Mar 2022
- Target energisation date
- 28 Feb 2024
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800061281957
- Import MPAN
- 1800051523646
- Last updated
- 19 Feb 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Grangemouth
GSP view2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 39.2 MW: 39.2 MW connected.
- Avondale Landfill No. 2Avondale Environmental Limited, Bioenergy and waste, POLMONT (11kV) primaryConnected6.6 MW
- Avondale LandfillAvondale Environmental Limited, Bioenergy and waste, MANUEL (11kV) primaryConnected4.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?