Avondale Landfill
Avondale Environmental Limited at Grangemouth
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 10 Mar 2003
- Status
- Connected
- Customer
- Avondale Environmental Limited
- Site name
- Avondale Landfill
- Address
- Avondale Quarry, Polmont, Falkirk, Falkirk, FK2 0YG
- Grid reference
- Easting 295394, northing 678757
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Grangemouth
- Bulk supply point
- Not stated
- Primary substation
- MANUEL (11kV)
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill gas, Steam-gas turbine (CCGT): 4.6 MW registered
- Registered capacity
- 4.6 MW
- Maximum export capacity
- 4.6 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800054883610
- Import MPAN
- 1800054883600
- Last updated
- 24 Nov 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Grangemouth
GSP view2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 39.2 MW: 39.2 MW connected.
- Calachem (Earls Gate Power Systems)Calachem Ltd, Gas and other fossil, AVECIA (Customer substation) primaryConnected28 MW
- Avondale Landfill No. 2Avondale Environmental Limited, Bioenergy and waste, POLMONT (11kV) primaryConnected6.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose