AGS Calderside Farm Solar

Advanced Grid Solutions Ltd at Westburn Road

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
1 Mar 2028
Status
Accepted to connect
Customer
Advanced Grid Solutions Ltd
Site name
AGS Calderside Farm Solar
Address
Land by Calderside Grove, East Kilbride, South Lanarkshire, G74 3SP
Grid reference
Easting 266564, northing 655748
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Westburn Road
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 66.78 MW registered
Registered capacity
66.78 MW
Change to maximum export capacity
63 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
14 Jun 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
SPT-RI-3638, SPT-RI-3639
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
2 Apr 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Flexible connection changed from “yes” to “no”
  • September 2026 edition
    In a connection queue changed from “yes” to “no”
  • May 2026 edition
    Customer stated as Advanced Grid Solutions Ltd (not stated in the April 2026 edition)

Also at Westburn Road

GSP view

3 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 114 MW: 7 MW connected, 107 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?