Advanced Grid Solutions Ltd
Customer named in the DNOs’ registers
In SPEN’s September 2026 edition
Capacity by DNO
| DNO | Edition | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|---|
| SPEN | September 2026 edition | 5 | 200 MW | – | 200 MW |
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Storage | 4 | 134 MW | – | 134 MW |
| Solar | 1 | 66.8 MW | – | 66.8 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| AGS Calderside Farm Solar | SPEN | Westburn Road | Solar | Accepted to connect | 66.78 |
| AGS Coatbridge BESS | SPEN | Coatbridge | Storage | Accepted to connect | 60 |
| AGS Newhouse BESS | SPEN | Newarthill | Storage | Accepted to connect | 30 |
| AGS Bonnyton Solar | SPEN | Giffnock | Storage | Accepted to connect | 29.7 |
| AGS Langlands Gate BESS Phase 2 | SPEN | East Kilbride South | Storage | Accepted to connect | 14 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Westburn Road | SPEN | 1 | – | 66.8 MW |
| Coatbridge | SPEN | 1 | – | 60 MW |
| Newarthill | SPEN | 1 | – | 30 MW |
| Giffnock | SPEN | 1 | – | 29.7 MW |
| East Kilbride South | SPEN | 1 | – | 14 MW |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 5 sites matched. Every August site and every September site had a match in the other edition.
- AGS Calderside Farm SolarSPEN, September 2026 editionFlexible connection changed from “yes” to “no”
- AGS Calderside Farm SolarSPEN, September 2026 editionIn a connection queue changed from “yes” to “no”
- AGS Bonnyton SolarSPEN, May 2026 editionFlexible connection changed from “yes” to “no”
- AGS Calderside Farm SolarSPEN, May 2026 editionCustomer stated as Advanced Grid Solutions Ltd (not stated in the April 2026 edition)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose