TUMMEL BRIDGE POWER STATION
SSE GENERATION LTD at TUMMEL BRIDGE
SSEN Embedded Capacity Register, May 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 15 Oct 2026
- Status
- Accepted to connect
- Customer
- SSE GENERATION LTD
- Site name
- TUMMEL BRIDGE POWER STATION
- Address
- TUMMEL BRIDGE POWER STATION, 3 RIVERSIDE TUMMEL BRIDGE, PITLOCHRY, PERTH AND KINROSS, PH16 5SB
- Grid reference
- Easting 276354, northing 759011
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- TUMMEL BRIDGE
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Hydro and marine
- Energy source 1
- WATER, HYDRO - OTHER: 6.46 MW registered
- Registered capacity
- 6.46 MW
- Change to maximum export capacity
- 0 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- December 2025 edition
Change history
Tracked from the December 2025 edition to the May 2026 edition, across 6 editions.
Changes to its status, capacity, technology or customer, newest first.
- June 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at TUMMEL BRIDGE
GSP view4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 37 MW: 37 MW connected.
- TUMMEL POWER STATIONSSE GENERATION LIMITED, Other or not stated, TUMMEL BRIDGE GRID primaryConnected17 MW
- TUMMEL POWER STATIONSSE GENERATION LIMITED, Other or not stated, TUMMEL BRIDGE GRID primaryConnected16.15 MW
- KELTNEYBURN HYDRO GENERATORKELTNEYBURN HYDRO LTD, Hydro and marine, TUMMEL BRIDGE GRID primaryConnected1.995 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose