STORNOWAY PS G9

SSE GENERATION LTD at ARDMORE GRID

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
SSE GENERATION LTD
Site name
STORNOWAY PS G9
Address
BATTERY POINT, STORNOWAY, ISLE OF LEWIS, HS1 2RP
Grid reference
Easting 143091, northing 932383
Licence area
North of Scotland (SHEPD)
Grid supply point
ARDMORE GRID
Bulk supply point
Not stated
Primary substation
BATTERY POINT
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 4.37 MW registered
Registered capacity
4.37 MW
Maximum export capacity
4.37 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700051730605
Import MPAN
Not stated
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • April 2025 edition
    Technology stated as Gas and other fossil (not stated in the March 2025 edition)

Also at ARDMORE GRID

GSP view

29 other sites at this grid supply point in the November 2026 edition, 7 of them at BATTERY POINT, the same primary substation. In all, the sites here total 258 MW: 79 MW connected, 179 MW accepted to connect.

  • STORNOWAY PS G3SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected4.37 MW
  • STORNOWAY PS G9SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected4.37 MW
  • STORNOWAY PS G8SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected3.325 MW
  • STORNOWAY PS G5SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected2.85 MW
  • STORNOWAY PS G1SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected1.938 MW
  • STORNOWAY PS G1SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected1.938 MW
  • STORNOWAY PS G6SSE GENERATION LTD, Gas and other fossil, BATTERY POINT primaryConnected1.9 MW
  • DRUIM LEATHANN WINDFARM LIMITEDDRUIM LEATHANN WINDFARM LIMITED, Wind, STORNOWAY GRID primaryAccepted49.7 MW

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose