QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SSE CONTRACTING

SSE CONTRACTING at COWLEY GSP

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2024
Status
Accepted to connect
Customer
SSE CONTRACTING
Site name
Not stated
Address
STFC - RAL SOLAR CAR PORTS, DIDCOT, OXFORDSHIRE, OX11 0QX
Grid reference
Easting 447602, northing 186447
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
Not stated
Primary substation
HARWELL
Connection voltage
Not stated
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 3.128 MW registered
Registered capacity
3.128 MW
Change to maximum export capacity
3.128 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
15 Jul 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Mar 2026
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at COWLEY GSP

GSP view

71 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 71

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose