QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Site not named

Name not shown at BRAMLEY (FLEE)

SSEN Embedded Capacity Register, April 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
27 Feb 2027
Status
Accepted to connect
Customer
Name not shown
Site name
Not stated
Address
THEALE, BERKSHIRE, RG7 4AP
Grid reference
Easting 464738, northing 170481
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (FLEE)
Bulk supply point
BURGHFIELD RESERVE
Primary substation
Not stated
Connection voltage
Not stated
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 55.3 MW registered
Registered capacity
55.3 MW
Change to maximum export capacity
0.263 MW
Change to maximum import capacity
0.263 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
27 Feb 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Mar 2026
Tracked since
April 2026 edition

Change history

Found in the April 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • May 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at BRAMLEY (FLEE)

GSP view

68 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.

See all 68

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose