SIDDINGTON PV

SIDDINGTON SOLAR FARM LIMITED at MINETY GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
13 Sep 2024
Status
Connected
Customer
SIDDINGTON SOLAR FARM LIMITED
Site name
SIDDINGTON PV
Address
LAND TO THE EAST OF ASHTON ROAD, SIDDINGTON, CIRENCESTER, GL7 6DB
Grid reference
Easting 403696, northing 197870
Licence area
Southern England (SEPD)
Grid supply point
MINETY GSP
Bulk supply point
CIRENCESTER
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 15.232 MW registered
Registered capacity
15.2 MW
Maximum export capacity
15.2 MW
Maximum import capacity
0.05 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060619259
Import MPAN
2000060619240
Last updated
12 Feb 2026
Tracked since
May 2025 edition

Change history

Tracked since the May 2025 edition, across 17 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at MINETY GSP

GSP view

59 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 59

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose