PART HAVELEYS SOLAR PARK
LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED at EAST CLAYDON GSP
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2031
- Status
- Accepted to connect
- Customer
- LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED
- Site name
- PART HAVELEYS SOLAR PARK
- Address
- PART HAVELEYS SOLAR PARK, WESTBURY COURT FARM MARSH GIBBON, BICESTER, OXFORDSHIRE, OX27 0AD
- Grid reference
- Easting 463295, northing 223554
- Licence area
- Southern England (SEPD)
- Grid supply point
- EAST CLAYDON GSP
- Bulk supply point
- BICESTER NORTH
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 45.5 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 27.7 MW registered
- Registered capacity
- 45.5 MW
- Change to maximum export capacity
- 45.5 MW
- Change to maximum import capacity
- 27.7 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 25 Sep 2020
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 38 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at EAST CLAYDON GSP
GSP view12 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 355 MW: 58 MW connected, 297 MW accepted to connect.
- ARDLEY EFW GENERATIONVIRIDOR WASTE MANAGEMENT LIMITED, Bioenergy and waste, ARDLEY LANDFILL GENER primaryConnected24.7 MW
- NEW STONE HOUSE FARM PVNEW STONE HOUSE FARM LIMITED, Solar, NEW STONE HOUSE PV primaryConnected8.978 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose