CIRENCESTER SOLAR PARK
ETHICAL POWER CONNECTIONS LTD at MINETY GSP
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 30 Nov 2026
- Status
- Accepted to connect
- Customer
- ETHICAL POWER CONNECTIONS LTD
- Site name
- CIRENCESTER SOLAR PARK
- Address
- ESTATE OFFICE, BATHURST ESTATES CIRENCESTER PARK CIRENCESTER, CIRENCESTER, GLOUCESTERSHIRE, GL7 2BU
- Grid reference
- Easting 402026, northing 202037
- Licence area
- Southern England (SEPD)
- Grid supply point
- MINETY GSP
- Bulk supply point
- CIRENCESTER
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 25 MW registered
- Registered capacity
- 25 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 13 Oct 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- December 2023 edition
Change history
Tracked since the December 2023 edition, across 35 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 30 Nov 2026 (not stated in the October 2025 edition)
Also at MINETY GSP
GSP view57 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.
- PURLIEUS BATTERY STORAGEMINETY SOUTH STORAGE EXPORT, Storage, MINETY BATTERY STORAGE primaryConnected94.991 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose