NAVIDALE FARM WIND

GREEN CAT RENEWABLES LTD at BRORA

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
22 Jun 2017
Status
Accepted to connect
Customer
GREEN CAT RENEWABLES LTD
Site name
NAVIDALE FARM WIND
Address
NAVIDALE FARM WIND, HELMSDALE, HIGHLAND, KW8 6JS
Grid reference
Easting 303714, northing 916007
Licence area
North of Scotland (SHEPD)
Grid supply point
BRORA
Bulk supply point
Not stated
Primary substation
BRORA GRID
Connection voltage
Not stated
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 15 MW registered
Registered capacity
15 MW
Change to maximum export capacity
15 MW
Change to maximum import capacity
0.135 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
22 Jun 2016
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Mar 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the March 2026 edition, across 31 editions. Not found in the February 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • February 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at BRORA

GSP view

2 other sites at this grid supply point in the September 2026 edition, 2 of them at BRORA GRID, the same primary substation. In all, the sites here total 138 MW: 138 MW accepted to connect.

  • CRAKAIG WIND ENERGY HUBBPUWL 27 LIMITED, Other or not stated, BRORA GRID primaryAccepted85.2 MW
  • 50MWOPDE UK LTD, Other or not stated, BRORA GRID primaryAccepted52.68 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose