MELVICH WIND ENERGY HUB
MELVICH WIND ENERGY HUB LIMITED at DOUNREAY
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2033
- Status
- Accepted to connect
- Customer
- MELVICH WIND ENERGY HUB LIMITED
- Site name
- MELVICH WIND ENERGY HUB
- Address
- MELVICH WIND ENERGY HUB, MELVICH, THURSO, HIGHLAND, KW14 7RZ
- Grid reference
- Easting 284210, northing 964807
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- DOUNREAY
- Bulk supply point
- Not stated
- Primary substation
- DOUNREAY
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 86.4 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 45.474 MW registered
- Registered capacity
- 86.4 MW
- Change to maximum export capacity
- 45.474 MW
- Change to maximum import capacity
- 45.474 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 16 May 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2025 edition
Change history
Tracked since the August 2025 edition, across 14 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at DOUNREAY
GSP view9 other sites at this grid supply point in the September 2026 edition, 7 of them at DOUNREAY, the same primary substation. In all, the sites here total 391 MW: 63 MW connected, 328 MW accepted to connect.
- HILL OF LYBSTER WIND TURBINES LLPHILL OF LYBSTER WIND TURBINES LLP, Wind, DOUNREAY primaryConnected2.35 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose