HYWIND (SCOTLAND) LIMITED
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 22 Aug 2017
- Status
- Connected
- Customer
- Not stated
- Site name
- HYWIND (SCOTLAND) LIMITED
- Address
- C/C STATOIL ASA
- Grid reference
- Not stated
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- PETERHEAD GRANGE
- Bulk supply point
- Not stated
- Primary substation
- PETERHEAD GRANGE 33KV
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 28.5 MW registered
- Registered capacity
- 28.5 MW
- Maximum export capacity
- 28.5 MW
- Maximum import capacity
- 0.475 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1799999999593
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2026
- Tracked since
- November 2023 edition
Change history
Tracked since the November 2023 edition, across 37 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at PETERHEAD GRANGE
GSP view4 other sites at this grid supply point in the November 2026 edition, 3 of them at PETERHEAD GRANGE 33KV, the same primary substation. In all, the sites here total 273 MW: 28 MW connected, 245 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?