QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BP PROJECT FLORA

Name not shown at PETERHEAD GRANGE

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2033
Status
Accepted to connect
Customer
Name not shown
Site name
BP PROJECT FLORA
Address
BP PROJECT FLORA, LAND ADJACENT TO A90 ST. FERGUS, PETERHEAD, ABERDEENSHIRE, AB42 3EL
Grid reference
Easting 410668, northing 849596
Licence area
North of Scotland (SHEPD)
Grid supply point
PETERHEAD GRANGE
Bulk supply point
Not stated
Primary substation
PETERHEAD GRANGE 33KV
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, OFFSHORE WIND TURBINES: 51 MW registered
Registered capacity
51 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
2 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
4 Jul 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2024 edition

Change history

Tracked since the August 2024 edition, across 26 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at PETERHEAD GRANGE

GSP view

4 other sites at this grid supply point in the September 2026 edition, 3 of them at PETERHEAD GRANGE 33KV, the same primary substation. In all, the sites here total 273 MW: 28 MW connected, 245 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose