BP PROJECT FLORA
Name not shown at PETERHEAD GRANGE
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2033
- Status
- Accepted to connect
- Customer
- Name not shown
- Site name
- BP PROJECT FLORA
- Address
- BP PROJECT FLORA, LAND ADJACENT TO A90 ST. FERGUS, PETERHEAD, ABERDEENSHIRE, AB42 3EL
- Grid reference
- Easting 410668, northing 849596
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- PETERHEAD GRANGE
- Bulk supply point
- Not stated
- Primary substation
- PETERHEAD GRANGE 33KV
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- WIND, OFFSHORE WIND TURBINES: 51 MW registered
- Registered capacity
- 51 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- 2 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 4 Jul 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2024 edition
Change history
Tracked since the August 2024 edition, across 26 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at PETERHEAD GRANGE
GSP view4 other sites at this grid supply point in the September 2026 edition, 3 of them at PETERHEAD GRANGE 33KV, the same primary substation. In all, the sites here total 273 MW: 28 MW connected, 245 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose