QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

GOWANFOLD WINDFARM

MEWSTEAD (FRASERBURGH) LLP at FRASERBURGH

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
MEWSTEAD (FRASERBURGH) LLP
Site name
GOWANFOLD WINDFARM
Address
FRASERBURGH, ABERDEENSHIRE, AB43 8TR
Grid reference
Easting 402179, northing 863035
Licence area
North of Scotland (SHEPD)
Grid supply point
FRASERBURGH
Bulk supply point
Not stated
Primary substation
FRASERBURGH
Connection voltage
11 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 1.235 MW registered
Registered capacity
1.235 MW
Maximum export capacity
1.235 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700052621999
Import MPAN
1700052621952
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FRASERBURGH

GSP view

5 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 293 MW: 1 MW connected, 292 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose