FRASERBURGH BATTERY PARK
FLEXION ENERGY UK STORAGE LTD at FRASERBURGH
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2027
- Status
- Accepted to connect
- Customer
- FLEXION ENERGY UK STORAGE LTD
- Site name
- FRASERBURGH BATTERY PARK
- Address
- FRASERBURGH BATTERY PARK, LAND AT HILLHEAD, FRASERBURGH, ABERDEENSHIRE, AB43 7BL
- Grid reference
- Easting 397438, northing 865540
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- FRASERBURGH
- Bulk supply point
- Not stated
- Primary substation
- FRASERBURGH GRID
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 48.29 MW registered
- Registered capacity
- 48.29 MW
- Change to maximum export capacity
- 40 MW
- Change to maximum import capacity
- 44.321 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 20 Apr 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 31 Oct 2027 (not stated in the October 2025 edition)
Also at FRASERBURGH
GSP view5 other sites at this grid supply point in the November 2026 edition, 4 of them at FRASERBURGH GRID, the same primary substation. In all, the sites here total 293 MW: 1 MW connected, 292 MW accepted to connect.
- FRASERBURGH ENERGY PLANTMERAKI CONSULTANTS LIMITED, Other or not stated, FRASERBURGH GRID primaryAccepted45 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?