FIRST ABERDEEN BESS

At WILLOWDALE

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
3 Oct 2027
Status
Accepted to connect
Customer
Not stated
Site name
FIRST ABERDEEN BESS
Address
FIRST ABERDEEN LTD 395, KING STREET, ABERDEEN, ABERDEEN CITY, AB24 5RP
Grid reference
Easting 394292, northing 807425
Licence area
North of Scotland (SHEPD)
Grid supply point
WILLOWDALE
Bulk supply point
Not stated
Primary substation
GREYFRIARS
Connection voltage
11 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 2 MW registered
Registered capacity
2 MW
Change to maximum export capacity
2.105 MW
Change to maximum import capacity
2.105 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
3 Oct 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
October 2025 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the October 2025 edition, across 14 editions.

Changes to the details QueueWatch tracks, newest first.

  • June 2026 edition
    Export capacity changed from 2 MW to 2.105 MW
  • May 2026 edition
    Export capacity changed from 2.105 MW to 2 MW
  • April 2026 edition
    Export capacity changed from 2 MW to 2.105 MW
  • November 2025 edition
    Target energisation date stated as 3 Oct 2027 (not stated in the October 2025 edition)

Also at WILLOWDALE

GSP view

No other site in SSEN’s November 2026 edition is at this grid supply point.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?