EVEREST D.C. DIESEL

EVEREST D.C. DIESEL at BRAMLEY (FLEE)

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
29 Feb 2020
Status
Accepted to connect
Customer
EVEREST D.C. DIESEL
Site name
EVEREST D.C. DIESEL
Address
EVEREST COMPUTING LTD, READING, BERKSHIRE, RG2 0QS
Grid reference
Easting 471114, northing 170325
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (FLEE)
Bulk supply point
BURGHFIELD MAIN
Primary substation
COURAGES
Connection voltage
Not stated
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 4.4 MW registered
Registered capacity
4.4 MW
Change to maximum export capacity
4.4 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
25 May 2016
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Mar 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the March 2026 edition, across 31 editions. Not found in the February 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • March 2026 edition
    Customer changed from GTC to EVEREST D.C. DIESEL
  • February 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

Also at BRAMLEY (FLEE)

GSP view

68 other sites at this grid supply point in the September 2026 edition, 2 of them at COURAGES, the same primary substation. In all, the sites here total 1.6 GW: 0.4 GW connected, 1.2 GW accepted to connect.

See all 68

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose