EMEC TIDAL TEST FACILITY
THE EUROPEAN MARINE ENERGY CENTRE LTD at THURSO
SSEN Embedded Capacity Register, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 May 2030
- Status
- Accepted to connect
- Customer
- THE EUROPEAN MARINE ENERGY CENTRE LTD
- Site name
- EMEC TIDAL TEST FACILITY
- Address
- EMEC TIDAL TEST FACILITY, WEST SIDE ROAD CALDALE EDAY, ORKNEY, ORKNEY ISLANDS, KW17 2AA
- Grid reference
- Easting 356219, northing 1030832
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- THURSO
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Hydro and marine
- Energy source 1
- WATER (FLOWING WATER OR HEAD OF WATER), HYDRO - OTHER: 22.5 MW registered
- Registered capacity
- 22.5 MW
- Change to maximum export capacity
- 22.8 MW
- Change to maximum import capacity
- 0.526 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 20 Dec 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- October 2026 edition
Change history
Tracked since the October 2026 edition.
Another record at this location is on a separate page.
Changes to the details QueueWatch tracks, newest first.
No changes to show: it has been found in one edition.
Also at THURSO
GSP view24 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 379 MW: 38 MW connected, 341 MW accepted to connect.
- CAIRNMORE HILL WIND GENERATING STATIONRENEWABLE ENERGY SYSTEMS LTD., Wind, THURSO GRID primaryAccepted46 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose