DEN OF GRAY ROAD

At CHARLESTON

SSEN Embedded Capacity Register, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
19 Sep 2026
Status
Accepted to connect
Customer
Not stated
Site name
DEN OF GRAY ROAD
Address
TAYC DGEN, STARKS STARK, WESTENR GATEWAY DEN OF GRAY ROAD, DUNDEE, DUNDEE CITY, DD2 5FU
Grid reference
Easting 334302, northing 731902
Licence area
North of Scotland (SHEPD)
Grid supply point
CHARLESTON
Bulk supply point
Not stated
Primary substation
GOURDIE
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 0.235 MW registered
Registered capacity
0.235 MW
Change to maximum export capacity
1.55 MW
Change to maximum import capacity
1.55 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
19 Sep 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
February 2026 edition

Change history

Tracked from the February 2026 edition to the August 2026 edition, across 5 editions. Not found in the April 2026 and July 2026 editions.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • July 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at CHARLESTON

GSP view

6 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 213 MW: 51 MW connected, 162 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose