WEST GOURDIE BESS

FS WEST GOURDIE LIMITED at CHARLESTON

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
24 Nov 2022
Status
Connected
Customer
FS WEST GOURDIE LIMITED
Site name
WEST GOURDIE BESS
Address
IMPORT/EXPORT, SOUTH ROAD, DUNDEE, DUNDEE, DD2 5JW
Grid reference
Easting 335151, northing 731537
Licence area
North of Scotland (SHEPD)
Grid supply point
CHARLESTON
Bulk supply point
Not stated
Primary substation
CHARLESTON GRID
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 47.405 MW registered
Registered capacity
47.405 MW
Maximum export capacity
47.405 MW
Maximum import capacity
47.405 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700060031860
Import MPAN
1700060031850
Last updated
12 Feb 2026
Tracked since
September 2023 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2023 edition
    Capacity changed from 49.9 MW to 47.405 MW

Also at CHARLESTON

GSP view

5 other sites at this grid supply point in the November 2026 edition, 2 of them at CHARLESTON GRID, the same primary substation. In all, the sites here total 213 MW: 51 MW connected, 162 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?