QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

DAVIDSON FARM PV AND BESS

IG RENEWABLES LTD at KEITH

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2035
Status
Accepted to connect
Customer
IG RENEWABLES LTD
Site name
DAVIDSON FARM PV AND BESS
Address
LAND SITUATED AT BONNETHILL FARM, MOSS-SIDE OLD SCHOOL AMD CLAYPOTS NEWMILL, KEITH, MORAY, AB55 6LD
Grid reference
Easting 345394, northing 853084
Licence area
North of Scotland (SHEPD)
Grid supply point
KEITH
Bulk supply point
Not stated
Primary substation
KEITH GRID
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 45.1 MW registered
Energy source 2
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 45 MW registered
Registered capacity
45.1 MW
Change to maximum export capacity
45 MW
Change to maximum import capacity
47.439 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
16 Jul 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at KEITH

GSP view

26 other sites at this grid supply point in the October 2026 edition, 22 of them at KEITH GRID, the same primary substation. In all, the sites here total 765 MW: 161 MW connected, 604 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose