CIRENCESTER SOLAR PARK - PV

AURA POWER DEVELOPMENTS LTD at MINETY GSP

SSEN Embedded Capacity Register, June 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
9 Apr 2027
Status
Accepted to connect
Customer
AURA POWER DEVELOPMENTS LTD
Site name
CIRENCESTER SOLAR PARK - PV
Address
CIRENCESTER SOLAR PARK, ESTATE OFFICE, BATHURST ESTATES CIRENCESTER PARK, CIRENCESTER, GLOUCESTERSHIRE, GL7 2BU
Grid reference
Easting 402020, northing 202041
Licence area
Southern England (SEPD)
Grid supply point
MINETY GSP
Bulk supply point
CIRENCESTER
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 49 MW registered
Registered capacity
49 MW
Change to maximum export capacity
49 MW
Change to maximum import capacity
0.333 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
11 Aug 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
September 2023 edition

Change history

Tracked from the September 2023 edition to the June 2026 edition, across 33 editions. Not found at 1 MW or over in the November 2023 edition.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
  • November 2025 edition
    Target energisation date stated as 9 Apr 2027 (not stated in the October 2025 edition)
  • February 2024 edition
    Capacity changed from 50 MW to 49 MW
  • February 2024 edition
    Export capacity changed from 50 MW to 49 MW
  • November 2023 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

Also at MINETY GSP

GSP view

58 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 58

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose