QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

CIRENCESTER PV

CIRENCESTER SOLAR FARM EXPORT at MINETY GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
CIRENCESTER SOLAR FARM EXPORT
Site name
CIRENCESTER PV
Address
WITPIT LANE, CIRENCESTER, GLOUCESTERSHIRE, GL7 5RP
Grid reference
Easting 405926, northing 201833
Licence area
Southern England (SEPD)
Grid supply point
MINETY GSP
Bulk supply point
CIRENCESTER
Primary substation
CIRENCESTER PV GENERATION
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 9.5 MW registered
Registered capacity
9.5 MW
Maximum export capacity
9.5 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060019385
Import MPAN
2000060019376
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 39 editions.

Changes to the details QueueWatch tracks, newest first.

  • April 2025 edition
    Technology stated as Solar (not stated in the March 2025 edition)
  • November 2023 edition
    Capacity stated as 9.5 MW (not stated in the October 2023 edition)
  • November 2023 edition
    Technology not stated (Solar in the October 2023 edition)
  • November 2023 edition
    Flexible connection stated as “no” (not stated in the October 2023 edition)

Also at MINETY GSP

GSP view

57 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 57

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose