QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BRADENSTOKE SOLAR PARK (LYNEHAM) PV

RENEWABLE ENERGY CONNECTIONS LTD at MINETY GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
20 Sep 2016
Status
Connected
Planning consent
Granted 13 Nov 2014
Wiltshire, reference 14/06989/FUL · Source: REPD
Customer
RENEWABLE ENERGY CONNECTIONS LTD
Site name
BRADENSTOKE SOLAR PARK (LYNEHAM) PV
Address
BRADENSTOKE SOLAR PARK, CHIPPENHAM, WILTSHIRE, SN15 4PZ
Grid reference
Easting 401380, northing 178741
Licence area
Southern England (SEPD)
Grid supply point
MINETY GSP
Bulk supply point
Not stated
Primary substation
LYDIARD PLAIN PV
Connection voltage
132 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 47.405 MW registered
Registered capacity
47.405 MW
Maximum export capacity
47.405 MW
Maximum import capacity
0.428 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056474877
Import MPAN
2000056474868
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MINETY GSP

GSP view

57 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 57

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.