QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BALDOVIE EFW LINE 3

MVV ENVIRONMENT BALDOVIE LIMITED at MILTON OF CRAIGIE

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
19 Jun 2020
Status
Connected
Customer
MVV ENVIRONMENT BALDOVIE LIMITED
Site name
BALDOVIE EFW LINE 3
Address
FORTIES ROAD, DUNDEE, ANGUS, DD4 0NS
Grid reference
Easting 344498, northing 733038
Licence area
North of Scotland (SHEPD)
Grid supply point
MILTON OF CRAIGIE
Bulk supply point
Not stated
Primary substation
MILTON OF CRAIGIE GRID
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
WASTE, ENGINE (COMBUSTION / RECIPROCATING): 9.499 MW registered
Registered capacity
9.499 MW
Maximum export capacity
9.499 MW
Maximum import capacity
3.325 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700053280191
Import MPAN
1700053280182
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MILTON OF CRAIGIE

GSP view

5 other sites at this grid supply point in the November 2026 edition, 4 of them at MILTON OF CRAIGIE GRID, the same primary substation. In all, the sites here total 147 MW: 22 MW connected, 125 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?