QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

AFFINITY WATER LIMITED

AFFINITY WATER LIMITED at IVER 132KV

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
AFFINITY WATER LIMITED
Site name
Not stated
Address
IVER WTW, THORNEY LANE NORTH, IVER, BUCKINGHAMSHIRE, SL0 9HF
Grid reference
Easting 503098, northing 179981
Licence area
Southern England (SEPD)
Grid supply point
IVER 132KV
Bulk supply point
UPTON
Primary substation
SUTTON LANE
Connection voltage
22 kV
Technology group
Gas and other fossil
Energy source 1
FOSSIL - OIL, ENGINE (COMBUSTION / RECIPROCATING): 4.703 MW registered
Registered capacity
4.703 MW
Maximum export capacity
4.703 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000055590011
Import MPAN
2000027323866
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • July 2025 edition
    Technology stated as Gas and other fossil (not stated in the June 2025 edition)

Also at IVER 132KV

GSP view

19 other sites at this grid supply point in the November 2026 edition, 2 of them at SUTTON LANE, the same primary substation. In all, the sites here total 281 MW: 178 MW connected, 103 MW accepted to connect.

See all 19

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?