POOLE FARM PV & BESS SYSTEM

SOURCE ENERGIE LIMITED at MANNINGTON GSP

SSEN Embedded Capacity Register, April 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
6 Dec 2036
Status
Accepted to connect
Customer
SOURCE ENERGIE LIMITED
Site name
POOLE FARM PV & BESS SYSTEM
Address
POOLE FARM PV & BESS SYSTEM, MORDEN ESTATE CHARBOROUGH PARK DORSET, BOURNEMOUTH, DORSET, BH20 7EN
Grid reference
Easting 392428, northing 97843
Licence area
Southern England (SEPD)
Grid supply point
MANNINGTON GSP
Bulk supply point
WAREHAM
Primary substation
WAREHAM TOWN
Connection voltage
132 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 105.507 MW registered
Energy source 2
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 63.158 MW registered
Registered capacity
105.507 MW
Change to maximum export capacity
105.507 MW
Change to maximum import capacity
63.158 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
17 Jun 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the April 2026 edition, across 33 editions.

Changes to its status, capacity, technology or customer, newest first.

  • May 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at MANNINGTON GSP

GSP view

92 other sites at this grid supply point in the September 2026 edition, 1 of them at WAREHAM TOWN, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 92

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose