6000KVA IMPORT LOAD & 576.5KW PV

At WILLESDEN GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
5 Jul 2027
Status
Accepted to connect
Customer
Not stated
Site name
6000KVA IMPORT LOAD & 576.5KW PV
Address
PERIVALE, GREENFORD, MIDDLESEX, UB6 7RH
Grid reference
Easting 516588, northing 183343
Licence area
Southern England (SEPD)
Grid supply point
WILLESDEN GSP
Bulk supply point
Not stated
Primary substation
PERIVALE
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 0.577 MW registered
Registered capacity
0.577 MW
Change to maximum export capacity
6 MW
Change to maximum import capacity
6 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
7 May 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 May 2026
Tracked since
June 2026 edition

Change history

Tracked since the June 2026 edition, across 2 editions. Not found in the July 2026 and August 2026 editions.

Changes to its status, capacity, technology or customer, newest first.

  • August 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • July 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at WILLESDEN GSP

GSP view

1 other site at this grid supply point in the September 2026 edition. In all, the sites here total 2.8 MW: 2.2 MW connected, 0.6 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose