6000KVA IMPORT LOAD & 576.5KW PV
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 5 Jul 2027
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- 6000KVA IMPORT LOAD & 576.5KW PV
- Address
- PERIVALE, GREENFORD, MIDDLESEX, UB6 7RH
- Grid reference
- Easting 516588, northing 183343
- Licence area
- Southern England (SEPD)
- Grid supply point
- WILLESDEN GSP
- Bulk supply point
- Not stated
- Primary substation
- PERIVALE
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 0.577 MW registered
- Registered capacity
- 0.577 MW
- Change to maximum export capacity
- 6 MW
- Change to maximum import capacity
- 6 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 7 May 2026
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 May 2026
- Tracked since
- November 2026 edition
Change history
Tracked since the November 2026 edition.
Changes to the details QueueWatch tracks, newest first.
No changes to show: it has been found in one edition.
Also at WILLESDEN GSP
GSP view2 other sites at this grid supply point in the November 2026 edition, 1 of them at PERIVALE, the same primary substation. In all, the sites here total 3.4 MW: 2.2 MW connected, 1.2 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?