QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

GLENROSSAL ENERGY PARK

ALLT AN TUIR RENEWABLE ENERGY PARK at SHIN

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2031
Status
Accepted to connect
Customer
ALLT AN TUIR RENEWABLE ENERGY PARK
Site name
GLENROSSAL ENERGY PARK
Address
GLENROSSAL ENERGY PARK, GLENROSSAL ESTATE ROSEHALL, SUTHERLAND, HIGHLAND, IV27 4BG
Grid reference
Easting 242825, northing 910234
Licence area
North of Scotland (SHEPD)
Grid supply point
SHIN
Bulk supply point
Not stated
Primary substation
SHIN GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 94.4 MW registered
Energy source 2
SOLAR, PHOTOVOLTAIC
Registered capacity
94.4 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
12.632 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
9 Dec 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 30 Jun 2031 (not stated in the October 2025 edition)
  • March 2024 edition
    Customer changed from REG HOLDINGS LTD to ALLT AN TUIR RENEWABLE ENERGY PARK

Also at SHIN

GSP view

5 other sites at this grid supply point in the November 2026 edition, 5 of them at SHIN GRID, the same primary substation. In all, the sites here total 253 MW: 41 MW connected, 212 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?