2MVA IMPORT 950KW PV ZERO EXP

At EAST CLAYDON GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
10 Jul 2027
Status
Accepted to connect
Customer
Not stated
Site name
2MVA IMPORT 950KW PV ZERO EXP
Address
TRITAX PARK ARDLEY, ARDLEY, OXFORDSHIRE, OX27 7SS
Grid reference
Easting 454776, northing 228965
Licence area
Southern England (SEPD)
Grid supply point
EAST CLAYDON GSP
Bulk supply point
BICESTER NORTH
Primary substation
BICESTER NORTH
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 0.949 MW registered
Registered capacity
0.949 MW
Change to maximum export capacity
2 MW
Change to maximum import capacity
2 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
10 Jul 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
7 Aug 2026
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at EAST CLAYDON GSP

GSP view

13 other sites at this grid supply point in the October 2026 edition, 2 of them at BICESTER NORTH, the same primary substation. In all, the sites here total 356 MW: 58 MW connected, 298 MW accepted to connect.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose