QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Sixpenny Wood Wind Farm

Sixpenny Wood Wind Farm at Drax

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
8 Nov 2012
Status
Connected
Customer
Sixpenny Wood Wind Farm
Site name
Sixpenny Wood Wind Farm
Address
Junction B1320, Spenny Wood Wind Farm, Goole, North Yorkshire, DN14 7XF
Grid reference
Easting 479631, northing 428549
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Drax
Bulk supply point
Osgodby 3/4
Primary substation
Sixpenny Wood Windfarm
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 20.077 MW registered
Registered capacity
20.077 MW
Maximum export capacity
20.077 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
2394000097068
Import MPAN
Not stated
Last updated
8 Mar 2017
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Drax

GSP view

27 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 909 MW: 115 MW connected, 794 MW accepted to connect.

  • Aura PowerAura Power, Storage, Aura Power Direct primaryAccepted120 MW
  • Oak Energy ParkOak Energy Park, Storage, Oak Energy Park Direct primaryAccepted110.2 MW
  • Church Dike Lane BESSChurch Dike Lane BESS, Storage, Church Dike Lane BESS Direct primaryAccepted99.9 MW
  • Spring Wood HybridSpring Wood Hybrid, Solar, Spring Wood Hybrid primaryAccepted82 MW
  • Magazine BESSMagazine BESS, Storage, Magazine BESS Direct primaryAccepted80 MW
  • Barlow SolarBarlow Solar, Solar, Barlow Solar Direct primaryAccepted49.99 MW
  • Osgodby Solar FarmOsgodby Solar Farm, Solar, Osgodby Solar Farm primaryAccepted49.9 MW
  • Barlby HybridBarlby Hybrid, Solar, Barlby Hybrid Direct primaryAccepted45.94 MW

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose