QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Sheridan Fabrications PV

Sheridan Fabrications PV at Ferrybridge B

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
14 Jan 2024
Status
Connected
Customer
Sheridan Fabrications PV
Site name
Sheridan Fabrications PV
Address
Sheridan Fabrications Ltd, Don Pedro Avenue, Normanton, West Yorkshire, WF6 1TD
Grid reference
Easting 439701, northing 422650
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Ferrybridge B
Bulk supply point
Featherstone
Primary substation
Sharlston
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 1.5 MW registered
Registered capacity
1.5 MW
Maximum export capacity
0.05 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
20 Oct 2022
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Sep 2023
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Ferrybridge B

GSP view

56 other sites at this grid supply point in the November 2026 edition, 1 of them at Sharlston, the same primary substation. In all, the sites here total 2.4 GW: 0.3 GW connected, 2.1 GW accepted to connect.

  • Deanfield PVDeanfield PV, Solar, Sharlston primaryAccepted4.94 MW
  • NEL Conway2 BESSNEL Conway2 BESS, Storage, NEL Conway2 BESS Direct primaryAccepted240 MW
  • Springfield FarmBluebell Battery Bank, Storage, Bluebell Battery Bank Direct primaryAccepted240 MW
  • Springfield FarmNEL Springfield, Storage, NEL Springfield Direct primaryAccepted240 MW
  • 200MW BESS at Land to West of Stocking Lane200MW BESS at Land to West of Stocking Lane, Storage, Stocking Lane BESS Direct primaryAccepted200 MW
  • NEL HunterNEL Hunter, Storage, NEL Hunter Direct primaryAccepted200 MW
  • Fryston Lane BESSFryston Lane BESS, Storage, Fryston Lane BESS Direct primaryAccepted100 MW
  • Ferrybridge BESSFerrybridge BESS, Storage, Ferrybridge BESS Direct primaryAccepted94.9 MW

See all 56

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?