QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Selby STOR BESS

Selby STOR BESS at Drax

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Selby STOR BESS
Site name
Selby STOR BESS
Address
Selby STOR, Whitemoor Business Park, Selby, North Yorkshire, YO8 6EG
Grid reference
Easting 466447, northing 435914
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Drax
Bulk supply point
Osgodby 1/2
Primary substation
Whitemoor
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 23.8 MW registered
Registered capacity
23.8 MW
Change to maximum export capacity
23.8 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
12 Dec 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Jan 2023
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Drax

GSP view

27 other sites at this grid supply point in the November 2026 edition, 1 of them at Whitemoor, the same primary substation. In all, the sites here total 909 MW: 115 MW connected, 794 MW accepted to connect.

  • Whitemoor STORWhitemoor STOR, Gas and other fossil, Whitemoor primaryConnected18 MW
  • Aura PowerAura Power, Storage, Aura Power Direct primaryAccepted120 MW
  • Oak Energy ParkOak Energy Park, Storage, Oak Energy Park Direct primaryAccepted110.2 MW
  • Church Dike Lane BESSChurch Dike Lane BESS, Storage, Church Dike Lane BESS Direct primaryAccepted99.9 MW
  • Spring Wood HybridSpring Wood Hybrid, Solar, Spring Wood Hybrid primaryAccepted82 MW
  • Magazine BESSMagazine BESS, Storage, Magazine BESS Direct primaryAccepted80 MW
  • Barlow SolarBarlow Solar, Solar, Barlow Solar Direct primaryAccepted49.99 MW
  • Osgodby Solar FarmOsgodby Solar Farm, Solar, Osgodby Solar Farm primaryAccepted49.9 MW

See all 27

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?