QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Salters Lane Solar Farm

Salters Lane Solar Farm at Hawthorn Pit Grid

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Salters Lane Solar Farm
Site name
Salters Lane Solar Farm
Address
Salters Lane Farm, Murton, Seaham, County Durham, SR7 9TN
Grid reference
Easting 437593, northing 546907
Licence area
North East (Northern Powergrid)
Grid supply point
Hawthorn Pit Grid
Bulk supply point
Hawthorn Pit Grid
Primary substation
Salters Lane PV
Connection voltage
66 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 97.5 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 21 MW registered
Registered capacity
118.5 MW
Change to maximum export capacity
118.5 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
4 Jan 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Dec 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Hawthorn Pit Grid

GSP view

23 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.1 GW connected, 1.0 GW accepted to connect.

See all 23

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?