High Moorsley Solar and BESS
High Moorsley Solar and BESS at Hawthorn Pit Grid
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- High Moorsley Solar and BESS
- Site name
- High Moorsley Solar and BESS
- Address
- High Moorsley Farm, HOUGHTON LE SPRING, Houghton Le Spring, Tyne and Wear, DH5 0RJ
- Grid reference
- Easting 433636, northing 545924
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Hawthorn Pit Grid
- Bulk supply point
- Hawthorn Pit Grid
- Primary substation
- High Moorsley Solar and BESS Direct
- Connection voltage
- 66 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 104 MW registered
- Registered capacity
- 104 MW
- Change to maximum export capacity
- 104 MW
- Change to maximum import capacity
- 49.4 MW
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 2 Oct 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Oct 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Hawthorn Pit Grid
GSP view23 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.1 GW connected, 1.0 GW accepted to connect.
- Colliery Farm SPV & BESSColliery Farm SPV & BESS, Solar, Colliery Farm SPV & BESS Direct primaryAccepted320.3 MW
- Southeast of Church Lane BESSSoutheast of Church Lane BESS, Storage, Southeast of Church Lane BESS Direct primaryAccepted100 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose