Rawcliffe Gas
Rawcliffe Gas at Camblesforth
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not published by Northern Powergrid
- Status
- Accepted to connect
- Customer
- Rawcliffe Gas
- Site name
- Rawcliffe Gas
- Address
- Rawcliffe Estate, Bridge Lane, Goole, North Yorkshire, DN14 8QP
- Grid reference
- Easting 468645, northing 422953
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Camblesforth
- Bulk supply point
- Camblesforth
- Primary substation
- Rawcliffe
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 6 MW registered
- Registered capacity
- 6 MW
- Change to maximum export capacity
- 6 MW
- Change to maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 2 May 2019
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Dec 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
- June 2026 editionTechnology changed from Gas and other fossil to Solar
Also at Camblesforth
GSP view15 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 553 MW: 173 MW connected, 380 MW accepted to connect.
- Station Road East BESSStation Road East BESS, Storage, Station Road East BESS Direct primaryAccepted99 MW
- Grange Road Multitech (38307)Grange Road Multitech (38307), Solar, Grange Road Multitech primaryAccepted59.9 MW
- Goole Fields Windfarm Site 2Goole Fields Windfarm Site 2, Wind, Goole Fields 2 Windfarm primaryConnected35 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?