QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Camela Lane Solar

Camela Lane Solar at Camblesforth

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Camela Lane Solar
Site name
Camela Lane Solar
Address
Camela Lane, Camblesforth, Selby, North Yorkshire, YO8 8HA
Grid reference
Easting 464052, northing 427385
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Camblesforth
Bulk supply point
Camblesforth
Primary substation
Camela Lane Solar
Connection voltage
66 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 49 MW registered
Registered capacity
49 MW
Change to maximum export capacity
49 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
15 Nov 2019
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Dec 2019
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Camblesforth

GSP view

15 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 553 MW: 173 MW connected, 380 MW accepted to connect.

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose