Port Office

Port Office PV 2 at Saltend North

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Port Office PV 2
Site name
Port Office
Address
Port Office, Northern Gateway, Hull, East Riding of Yorkshire, HU9 5PQ
Grid reference
Easting 510360, northing 428892
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Saltend North
Bulk supply point
Hull East 132/33kV
Primary substation
King George Dock
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2.2 MW registered
Registered capacity
2.2 MW
Change to maximum export capacity
2.2 MW
Change to maximum import capacity
9.5 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
5 Nov 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
9 Dec 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Saltend North

GSP view

31 other sites at this grid supply point in the November 2026 edition, 2 of them at King George Dock, the same primary substation. In all, the sites here total 971 MW: 119 MW connected, 852 MW accepted to connect.

  • Hull Wind FarmHull Wind Farm, Wind, King George Dock primaryAccepted6.9 MW
  • Port House SolarCustom Solar, Solar, King George Dock primaryAccepted6 MW
  • NEL Suggit BESSNEL Suggit BESS, Storage, NEL Suggit BESS Direct primaryAccepted240 MW
  • NEL Limes BESSNEL Limes BESS, Storage, NEL Suggit BESS Direct primaryAccepted200 MW
  • Magdalen Farm HybridMagdalen Farm Hybrid, Solar, Magdalen Farm Hybrid Direct primaryAccepted70.15 MW
  • Great Field LaneGreat Field Lane BESS, Storage, Great Field Lane BESS Direct primaryAccepted60 MW
  • Aldbrough Gas StorageAldbrough Gas Storage, Gas and other fossil, Aldbrough Gas Caverns Direct primaryAccepted50 MW
  • High Bridge Farm HybridHigh Bridge Farm Hybrid, Storage, High Bridge Farm Hybrid Direct primaryAccepted50 MW

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?