Parkwood Landfill
Parkwood Landfill at Neepsend
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Apr 2010
- Status
- Connected
- Customer
- Parkwood Landfill
- Site name
- Parkwood Landfill
- Address
- Parkwood Landfill Site, Parkwood Road, Sheffield, South Yorkshire, S3 8AG
- Grid reference
- Easting 434321, northing 389324
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Neepsend
- Bulk supply point
- Neepsend
- Primary substation
- Penistone Road
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Gas turbine (OCGT): 5 MW registered
- Registered capacity
- 5 MW
- Maximum export capacity
- 2.5 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 2394000027948
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Neepsend
GSP view2 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 52.1 MW: 7.1 MW connected, 45 MW accepted to connect.
- Fletchers Bakery HybridFletchers Bakery Hybrid, Gas and other fossil, Claywheels Lane primaryConnected2.05 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?