Langthwaite Gas

Langthwaite Gas at Ferrybridge A

Northern Powergrid Embedded Capacity Register 1MW and Over, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Langthwaite Gas
Site name
Langthwaite Gas
Address
Unit 18, Langthwaite Business Park, South Kirkby, North Yorkshire, HU11 4JH
Grid reference
Easting 513027, northing 436224
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Ferrybridge A
Bulk supply point
Ferrybridge A
Primary substation
South Elmsall
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 1.84 MW registered
Registered capacity
1.84 MW
Change to maximum export capacity
1.84 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
19 Jul 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at Ferrybridge A

GSP view

17 other sites at this grid supply point in the November 2026 edition, 6 of them at South Elmsall, the same primary substation. In all, the sites here total 298 MW: 31 MW connected, 267 MW accepted to connect.

  • Frickley Lane PVFrickley Lane PV, Solar, South Elmsall primaryAccepted25 MW
  • Elmsall Way PVElmsall Way PV, Solar, South Elmsall primaryConnected3.6 MW
  • Next SolarNext Solar, Solar, South Elmsall primaryConnected2 MW
  • Langthwaite GasLangthwaite Gas, Gas and other fossil, South Elmsall primaryAccepted1.84 MW
  • Elmsall Way StandbyElmsall Way Standby, Gas and other fossil, South Elmsall primaryConnected1.6 MW
  • Finlay Beverages LtdFinlay Beverages PV, Solar, South Elmsall primaryAccepted1.5 MW
  • Hillam Solar FarmHillam Solar Farm, Solar, Hillam Solar Farm primaryAccepted49.95 MW
  • Ledston BESSLedston BESS, Storage, Ledston BESS primaryAccepted49.9 MW

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?