QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Next Solar

Next Solar at Ferrybridge A

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
10 May 2022
Status
Connected
Customer
Next Solar
Site name
Next Solar
Address
ELMSALL WAY WAREHOUSE, DALE LANE, PONTEFRACT, West Yorkshire, WF9 2XT
Grid reference
Easting 448192, northing 412078
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Ferrybridge A
Bulk supply point
Ferrybridge A
Primary substation
South Elmsall
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 2 MW registered
Registered capacity
2 MW
Maximum export capacity
2 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
11 Sep 2020
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
9 Oct 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Ferrybridge A

GSP view

16 other sites at this grid supply point in the September 2026 edition, 5 of them at South Elmsall, the same primary substation. In all, the sites here total 298 MW: 31 MW connected, 267 MW accepted to connect.

  • Frickley Lane PVFrickley Lane PV, Solar, South Elmsall primaryAccepted25 MW
  • Elmsall Way PVElmsall Way PV, Solar, South Elmsall primaryConnected3.6 MW
  • Langthwaite GasLangthwaite Gas, Gas and other fossil, South Elmsall primaryAccepted1.84 MW
  • Elmsall Way StandbyElmsall Way Standby, Gas and other fossil, South Elmsall primaryConnected1.6 MW
  • Finlay Beverages LtdFinlay Beverages PV, Solar, South Elmsall primaryAccepted1.5 MW
  • Hillam Solar FarmHillam Solar Farm, Solar, Hillam Solar Farm primaryAccepted49.95 MW
  • Ledston BESSLedston BESS, Storage, Ledston BESS primaryAccepted49.9 MW
  • Ardagh Glass SolarArdagh Glass Solar, Solar, Ardagh Glass Solar primaryAccepted40 MW

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose