Kirkheaton Wind Ltd
Kirkheaton Wind Ltd at Stella South
Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 15 May 2000
- Status
- Connected
- Planning consent
- Granted on appeal 21 Jan 1999
Northumberland · Source: REPD - Customer
- Kirkheaton Wind Ltd
- Site name
- Kirkheaton Wind Ltd
- Address
- West Farm, Kirkheaton, Newcastle Upon Tyne, Tyne and Wear, NE19 2DQ
- Grid reference
- Easting 401765, northing 577477
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Stella South
- Bulk supply point
- Coalburns
- Primary substation
- West Wylam
- Connection voltage
- 20 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 1.52 MW registered
- Registered capacity
- 1.52 MW
- Maximum export capacity
- 1.52 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1507507549988
- Import MPAN
- Not stated
- Last updated
- 8 Mar 2017
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 9 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Stella South
GSP view29 other sites at this grid supply point in the November 2026 edition, 1 of them at West Wylam, the same primary substation. In all, the sites here total 1.1 GW: 42.4 MW connected, 1.1 GW accepted to connect.
- Newcastle Battery StorageNewcastle Battery Storage, Storage, Newcastle BESS Direct primaryAccepted99.8 MW
- Maiden Hill Farm BESSMaiden Hill Farm BESS, Storage, Maiden Hill Farm BESS Direct primaryAccepted99.4 MW
- Old Neolith Building BESSOld Neolith Building BESS, Storage, Old Neolith Building BESS Direct primaryAccepted96.24 MW
- Harperley Lane Solar & BESSHarperley Lane Solar & BESS, Storage, Harperley Lane Direct primaryAccepted92.9 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.