QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Birtley BESS

Birtley BESS at Stella South

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Birtley BESS
Site name
Birtley BESS
Address
Northeast Concrete, Longshank Lane, Gateshead, Tyne and Wear, DH3 1QZ
Grid reference
Easting 426259, northing 556714
Licence area
North East (Northern Powergrid)
Grid supply point
Stella South
Bulk supply point
Ravensworth
Primary substation
Birtley BESS
Connection voltage
66 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 71 MW registered
Registered capacity
71 MW
Change to maximum export capacity
71 MW
Change to maximum import capacity
70.965 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
6 Mar 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
9 Sep 2024
Tracked since
August 2026 edition

Change history

Tracked since the August 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Stella South

GSP view

29 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.1 GW: 42.4 MW connected, 1.1 GW accepted to connect.

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose