Hull Waste Treatment Works Wind
Hull Waste Treatment Works at Saltend North
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Hull Waste Treatment Works
- Site name
- Hull Waste Treatment Works Wind
- Address
- Hull Waste Treatment Works, Hull Road, Hull, North Yorkshire, HU12 8EY
- Grid reference
- Easting 516212, northing 429050
- Licence area
- Yorkshire (Northern Powergrid)
- Grid supply point
- Saltend North
- Bulk supply point
- Saltend 132/33kV
- Primary substation
- Yorkshire Water Hull Road
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 1.3 MW registered
- Registered capacity
- 1.3 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- Not stated
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 4 Jul 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Saltend North
GSP view31 other sites at this grid supply point in the September 2026 edition, 1 of them at Yorkshire Water Hull Road, the same primary substation. In all, the sites here total 971 MW: 119 MW connected, 852 MW accepted to connect.
- Hull Waste Treatment WorksHull Sewage Works, Gas and other fossil, Yorkshire Water Hull Road primaryConnected1.5 MW
- Magdalen Farm HybridMagdalen Farm Hybrid, Solar, Magdalen Farm Hybrid Direct primaryAccepted70.15 MW
- Aldbrough Gas StorageAldbrough Gas Storage, Gas and other fossil, Aldbrough Gas Caverns Direct primaryAccepted50 MW
- High Bridge Farm HybridHigh Bridge Farm Hybrid, Storage, High Bridge Farm Hybrid Direct primaryAccepted50 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose