QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Greencore Foods CHP

Greencore Foods CHP at Thurcroft

Northern Powergrid Embedded Capacity Register 1MW and Over, July 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Greencore Foods CHP
Site name
Greencore Foods CHP
Address
Greencore Prepared Meals, Mansfield, SHEFFIELD, West Yorkshire, DN3 1ET
Grid reference
Easting 460316, northing 409613
Licence area
Yorkshire (Northern Powergrid)
Grid supply point
Thurcroft
Bulk supply point
Thurcroft
Primary substation
Beighton
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 1.5 MW registered
Registered capacity
1.5 MW
Change to maximum export capacity
1.5 MW
Change to maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
3 Jul 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
8 May 2024
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the July 2026 edition, across 5 editions.

Another record at this location is on a separate page.

Changes to the details QueueWatch tracks, newest first.

  • August 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at Thurcroft

GSP view

26 other sites at this grid supply point in the November 2026 edition, 3 of them at Beighton, the same primary substation. In all, the sites here total 837 MW: 156 MW connected, 681 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?